Geneva, canton of Geneva
Roads, access routes and parking spaces in the city of Geneva at a lower cost
A garage access is built in layers, from the subgrade to the finish. MS Contractor SA builds access routes and car parks in the city of Geneva.
Album of our projectsLiving rooms, kitchens, bathrooms, facades and moreIn brief
MS Contractor SA builds garage accesses, parking spaces, courtyards and private paths in the city of Geneva for villas and buildings. Earthworks, subgrade, compacted gravel, kerbs, drainage and gratings, asphalt, pavers or stabilised gravel, marking and lighting are included in the quote.
The context in the city of Geneva
Geneva, the central city of the canton, spreads out on both sides of the harbour and the Rhône, from the Old Town to the dense Pâquis, Eaux-Vives, Plainpalais, Champel and Servette districts. Residential buildings, often old, managed by property management agencies and subject to heritage rules, dominate the built fabric. Traffic, parking for machinery and use of public land shape every worksite.
Access routes and parking spaces in the city of Geneva
Asphalt or paved garage accesses, permeable parking spaces in grass grid slabs or stabilised gravel, kerbs and channels.
The falls carry water towards the gratings.
Courtyards and paths
Building courtyards, private paths and footpaths with a compacted subgrade and the finish of your choice.
The services under the surface are laid beforehand.
Repairs and reworking
Reworking of potholes, sunken areas and kerbs, and full resurfacing of a wearing course.
The parking space marking is redone.
The items of an access quote in the city of Geneva
- Earthworks and subgrade
- Drainage and gratings
- Kerbs and channels
- Compacted gravel
- Asphalt, pavers or stabilised gravel
- Marking and handover
A single point of contact who manages all the trades
One contact person follows your worksite from the quote to the handover. MS Contractor SA brings together its own teams and the other trades needed, sets the schedule with you and keeps you informed of progress.
How a request runs
You describe the project via the form, by phone on +41 79 557 14 50 or by email with a few photos. We get back to you to specify the work, then we visit the premises to measure the surfaces and the condition of the substrates.
The quote describes each item, the planned duration and what is not included. After your written agreement, the start date is set with you and a manager follows the worksite until the handover.
Roads, access and car parks in the canton All the work in the city of Geneva Underpinning in the city of Geneva Pipework in the city of Geneva Earthworks in the city of Geneva Outdoor landscaping in the city of Geneva Terraces and paving in the city of Geneva Fences in the city of Geneva All municipalities
Frequently asked questions
Your questions in the city of Geneva
How long does building a garage access in the city of Geneva take?
About one week, with drying time for pavers and one day for asphalt. The quote describes each item, the planned duration and what is not included.
Is a permit needed for an access or a parking space in the city of Geneva?
Resurfacing an existing access does not require one. A new parking space, a new access onto the road or a sealed surface requires the agreement of the municipality and the canton, which we prepare with you. The details of the procedures are on the website of the State of Geneva, on the applying for a building permit page.
Asphalt, pavers or gravel in the city of Geneva?
Asphalt is the easiest to maintain, pavers are hard-wearing and can be repaired piece by piece, stabilised gravel stays permeable and suits parking spaces.
How should rainwater be handled in the city of Geneva?
With falls towards gratings and channels connected to the rainwater system, or with permeable surfaces that let the water soak in.
Your project
An access or a car park to build in the city of Geneva?
Tell us the surface and the covering you would like. MS Contractor SA gets back to you to arrange a visit and draw up a detailed quote.
