Presinge, canton of Geneva
Roads, access and parking spaces in Presinge at a lower cost
A garage access is built in layers, from the subgrade to the finish. MS Contractor SA builds access routes and car parks in Presinge.
Album of our projectsLiving rooms, kitchens, bathrooms, facades and moreIn brief
MS Contractor SA builds garage accesses, parking spaces, courtyards and private paths in Presinge for villas and buildings. Earthworks, subgrade, compacted gravel, kerbs, drainage and gratings, asphalt, pavers or stabilised gravel, marking and lighting are included in the quote.
The context in Presinge
Presinge is a small farming municipality in eastern Geneva, on the border, made up of a village and hamlets scattered among fields and woods. The buildings are mainly farms, old houses and villas built on the edge of the village.
Access routes and parking spaces in Presinge
Asphalt or paved garage accesses, permeable parking spaces in grass grid slabs or stabilised gravel, kerbs and channels.
The falls carry water towards the gratings.
Courtyards and paths
Building courtyards, private paths and footpaths with a compacted subgrade and the finish of your choice.
The services under the surface are laid beforehand.
Repairs and reworking
Reworking of potholes, sunken areas and kerbs, and full resurfacing of a wearing course.
The parking space marking is redone.
The items of an access quote in Presinge
- Earthworks and subgrade
- Drainage and gratings
- Kerbs and channels
- Compacted gravel
- Asphalt, pavers or stabilised gravel
- Marking and handover
A single point of contact who manages all the trades
One person follows your worksite from the quote to the handover. MS Contractor SA brings together its teams and the other trades useful to the worksite. The schedule is set with you and you are kept informed of progress.
How a request runs
You present the project to us with a few photos via the form, by phone on +41 79 557 14 50 or by email. We call you back to specify the work and then come to measure the surfaces and the condition of the substrates.
The quote describes each item, the planned duration and what is not included. Once your written agreement is received, we set the start date together and a manager follows the worksite until the handover.
Roads, access and car parks in the canton All the work in Presinge Parquet in Presinge Joinery in Presinge Plumbing in Presinge Electrical work in Presinge Heating in Presinge Insulation in Presinge Access routes and car parks in Gy Access routes and car parks in Jussy Access routes and car parks in Laconnex All municipalities
Frequently asked questions
Your questions in Presinge
How long does building a garage access in Presinge take?
About one week, with drying time for pavers and one day for asphalt. The quote describes each item, the planned duration and what is not included.
Is a permit needed for an access or a parking space in Presinge?
Resurfacing an existing access does not require one. A new parking space, a new access onto the road or a sealed surface requires the agreement of the municipality and the canton, which we prepare with you. The details of the procedures are on the website of the State of Geneva, on the applying for a building permit page.
Asphalt, pavers or gravel in Presinge?
Asphalt is the easiest to maintain, pavers are hard-wearing and can be repaired piece by piece, stabilised gravel stays permeable and suits parking spaces.
How should rainwater be handled in Presinge?
With falls towards gratings and channels connected to the rainwater system, or with permeable surfaces that let the water soak in.
Your project
An access or a car park to build in Presinge?
Tell us the surface and the covering you would like. We call you back to arrange a visit, then we prepare a detailed quote.
