MS Contractor SA
Kitchen renovation in houses and apartments in Bellevue at a lower cost
Your project is prepared with you.
A single contact who manages all the trades.
Album of our projectsLiving rooms, kitchens, bathrooms, facades and moreLet us talk about
your project.
Tell us about your project, which municipality and which spaces. Together, we clarify the work to plan before preparing the quote.
In Bellevue, you would like to redo the kitchen of your house or apartment. First tell us what you would like to change in the current room. MS Contractor SA prepares the work from these needs, the space available and the finishes you are looking for.






In Geneva, as in the rest of the canton, MS Contractor SA is with you. Let us talk about your project
Starting from the existing kitchen
We record the dimensions, openings and passages before settling the layout. The position of the water, drains, sockets and lighting counts as much as that of the units. This survey lets us decide which elements to keep and which installations to adapt.
A layout suited to everyday life
Do you have enough room to prepare a meal or store your appliances? The answer guides the choice of storage, worktop and light points. Depending on the home, it can also help to clear a passage or link the kitchen better to the living room.
Preparing the technical work
The work starts with the preparation. After removal, we organise the work on the plumbing, electrics and ventilation, then on the walls, floor and splashback. The units are installed when their bases and connections are ready.
Request a quote
Present your kitchen renovation project in Bellevue, the type of home and the main changes you would like. Click “Request a quote” to receive a first reply from MS Contractor SA
Do you need an architect or a building permit?
It depends on the home and the work planned. Replacing the units, coverings, electrics and plumbing of a kitchen, without moving a partition or creating an opening, generally counts as maintenance and routine renovation. As soon as the structure, the layout, the facade or the use is affected, or if the building is protected or subject to the LDTR, a building permit and a representative may be required in Geneva. Before starting, have your project checked by your architect, your MPQ or the Department of Territory. The procedures are explained on the “applying for a building permit” page of the State of Geneva. The planned work is organised and carried out by MS Contractor SA with your representative.
If the project opens the kitchen onto the living room, moves a partition or affects the facade, a permit becomes necessary. In that case, we prepare the application with you and call on a partner architect when the file requires it.
Frequently asked questions
Can the position of the sink be changed?
Feasibility depends on the water supplies and drains. It is checked before the work.
Should the appliances be planned from the start?
Their dimensions and connection needs are useful to prepare the future layout.
