Collex-Bossy, canton of Geneva

Pipework and drainage in Collex-Bossy at a lower cost

Pipework is renewed in good time to protect the house. MS Contractor SA lays and replaces pipes in Collex-Bossy.

Our projects
Outdoor slab with blue ducts, timber formwork and a concrete staircaseAlbum of our projectsLiving rooms, kitchens, bathrooms, facades and more

In brief

MS Contractor SA lays and replaces pipes in Collex-Bossy for villas, buildings and plots. Wastewater and rainwater collectors in PVC or PE, connection to the municipal network, separation of the systems, inspection chambers, foundation drainage, excavation and backfilling, camera inspection and spot repairs are included in the quote.

The context in Collex-Bossy

The two villages of Collex and Bossy, surrounded by fields and woods, make up this rural municipality on the right bank. Farms and village houses form the old cores, around which villa districts have developed. Arriving through the countryside is easy, and the agricultural character of the territory is to be respected.

Replacing pipes in Collex-Bossy

Excavation with a digger, removal of the old pipes, new PVC or PE pipes with inspection chambers and connection to the municipal network.

The ground and surfaces are made good.

Separating the systems and drainage

Separation of wastewater and rainwater as required by the municipalities, foundation drainage, soakaways and retention.

The plans are supplied for the municipal file.

Inspection and repairs

Camera inspection, locating sections to rework and roots, spot repair or relining without excavation.

A quick visit keeps the work contained.

The items in a pipework quote in Collex-Bossy

  • Camera inspection and locating
  • Excavation and shoring
  • Pipes and manholes
  • Connection to the network
  • Backfilling and reinstatement
  • Tests and handover

A single point of contact who manages all the trades

One contact person follows your worksite from the quote to the handover. MS Contractor SA brings together its own teams and the other trades needed, sets the schedule with you and keeps you informed of progress.

How a request runs

You describe the project via the form, by phone on +41 79 557 14 50 or by email with a few photos. We get back to you to specify the work, then we visit the premises to measure the surfaces and the condition of the substrates.

The quote describes each item, the planned duration and what is not included. After your written agreement, the start date is set with you and a manager follows the worksite until the handover.

Pipework in the canton All the work in Collex-Bossy Joinery in Collex-Bossy Plumbing in Collex-Bossy Electrical work in Collex-Bossy Heating in Collex-Bossy Insulation in Collex-Bossy Sound insulation in Collex-Bossy Pipework in Bellevue Pipework in Céligny Pipework in Dardagny All municipalities

Frequently asked questions

Your questions in Collex-Bossy

How long does replacing the pipes of a villa in Collex-Bossy take?

One to two weeks depending on the length and depth of the excavation. The quote describes each item, the planned duration and what is not included.

Is a permit needed for pipework in Collex-Bossy?

Connection to the public network and separating the systems are declared to the municipality, which approves the plans. We prepare the file with you. The details of the procedures are on the website of the State of Geneva, on the applying for a building permit page.

Can repairs be made without digging in Collex-Bossy?

Often yes, by relining the inside of the pipe after camera inspection, when the pipe is still in place and accessible.

What does separating the systems mean in Collex-Bossy?

Rainwater and wastewater are carried in two separate networks, as the Geneva municipalities require during renovations.

Your project

Pipes to replace in Collex-Bossy?

Describe the plot and your project. MS Contractor SA gets back to you to arrange a visit and draw up a detailed quote.

Tell us about my project WhatsApp
Tell us about my project Version française