Bardonnex, canton of Geneva

Pipework and drainage in Bardonnex at a lower cost

Pipework is renewed in good time to protect the house. MS Contractor SA lays and replaces pipes in Bardonnex.

Our projects
Outdoor slab with blue ducts, timber formwork and a concrete staircaseAlbum of our projectsLiving rooms, kitchens, bathrooms, facades and more

In brief

MS Contractor SA lays and replaces pipes in Bardonnex for villas, buildings and plots. Wastewater and rainwater collectors in PVC or PE, connection to the municipal network, separation of the systems, inspection chambers, foundation drainage, excavation and backfilling, camera inspection and spot repairs are included in the quote.

The context in Bardonnex

In the south of the canton, Bardonnex brings together several villages and hamlets, including a former commandery site, among fields and vines, and is home to the large motorway customs crossing. Old farms and village houses sit next to villa districts linked by small country roads.

Replacing pipes in Bardonnex

Excavation with a digger, removal of the old pipes, new PVC or PE pipes with inspection chambers and connection to the municipal network.

The ground and surfaces are made good.

Separating the systems and drainage

Separation of wastewater and rainwater as required by the municipalities, foundation drainage, soakaways and retention.

The plans are supplied for the municipal file.

Inspection and repairs

Camera inspection, locating sections to rework and roots, spot repair or relining without excavation.

A quick visit keeps the work contained.

The items in a pipework quote in Bardonnex

  • Camera inspection and locating
  • Excavation and shoring
  • Pipes and manholes
  • Connection to the network
  • Backfilling and reinstatement
  • Tests and handover

A single point of contact who manages all the trades

From the quote to the handover, you keep the same contact person. Our teams and the other trades needed are coordinated by MS Contractor SA, which sets the schedule with you and keeps you up to date on progress.

How a request runs

Describe the project to us via the form, on +41 79 557 14 50 or by email, ideally with a few photos. After a call back to specify the work, we visit the premises and measure the surfaces and the condition of the substrates.

In the quote, you will find each item, the planned duration and what is not included. As soon as you give your written agreement, the start date is set with you and a manager follows the worksite until the handover.

Pipework in the canton All the work in Bardonnex Sheds and outbuildings in Bardonnex Access routes and car parks in Bardonnex General contractor in Bardonnex Shops in Bardonnex Masonry in Bardonnex Tiling in Bardonnex Pipework in Chêne-Bourg Pipework in Collonge-Bellerive Pipework in Cologny All municipalities

Frequently asked questions

Your questions in Bardonnex

How long does replacing the pipes of a villa in Bardonnex take?

One to two weeks depending on the length and depth of the excavation. In the quote, you will find each item, the planned duration and what is not included.

Is a permit needed for pipework in Bardonnex?

Connection to the public network and separating the systems are declared to the municipality, which approves the plans. We prepare the file with you. The details of the procedures are on the website of the State of Geneva, on the applying for a building permit page.

Can repairs be made without digging in Bardonnex?

Often yes, by relining the inside of the pipe after camera inspection, when the pipe is still in place and accessible.

What does separating the systems mean in Bardonnex?

Rainwater and wastewater are carried in two separate networks, as the Geneva municipalities require during renovations.

Your project

Pipes to replace in Bardonnex?

Describe the plot and your project. MS Contractor SA gets back in touch with you to organise the visit and write the detailed quote.

Tell us about my project WhatsApp
Tell us about my project Version française